Project Experience
Hover or tap a project to read more.
Supported the progressive design-build delivery of a regional wayfinding program integrating subway, bus, and light rail systems across the Bay Area.
Designed temporary shoring for skid-crane operations at a Genentech facility, providing safe structural support during construction.
Supported structural demolition and repair work at the Carquinez Bridge Toll Administration Building, including temporary works and structural solutions required to complete the repairs.
Served as Structures Representative and Construction Manager for the Honeydew Bridge reconstruction, overseeing falsework and shoring reviews, concrete piling, steel erection, expansion joints, shop drawings, and material submittals.
Prepared architectural and structural drawings for the renovation of 727 Traders Lane into Yager Lodge, including design of the restaurant floor system and interior walls.
Designed a new steel-and-concrete outdoor canopy for the restaurant, including the structural steel system and supporting concrete elements.
Provided project and construction management for major safety improvements along State Route 299 near Willow Creek, overseeing roadway widening, retaining-wall construction, and associated culvert and drainage improvements near the East Fork Willow Creek Bridge.
Designed marine falsework and supported pile-cap, pile-driving, and repair operations for the San Francisco Bay Navigation Project.